Photo

Patrick Chak Yuen Wong Senior Structural Engineer

San Francisco, CA Patrick-Chak-Yuen-Wong-Resume.pdf
Contact

Send Message

To contact this candidate email pwong280280@gmail.com

Contact using webmail: Gmail / AOL / Yahoo / Outlook

Patrick Chak Yuen Wong

P.E., Aff. M. ASCE, MICE

TELEPHONE

011-852-92349767 (Hong Kong Mobile)

EMAIL ADDRESS

PWONG280280@GMAIL.COM

EDUCATION

University of California, Davis, Bachelor of Science in Civil Engineering (Sept 99 -Dec 03)

REGISTRATION

California Professional Engineer License #75441 (Nov, 2009)

Engineer-In-Training (E.I.T.) Certificate #116785

American Society of Civil Engineers, Affiliated Member #974180

Institution of Civil Engineer, MICE #68203125 (Sept, 2011)

PROFESSIONAL EXPERIENCE

Sanfield Building Construction LTD, Hong Kong (Jun 18 – Present)

Senior Structural Engineer

Coordinate with client and subcontractor on procedure regarding to top down construction

Resolve inquiries and comments from the building department of Hong Kong government relating to design and build items; make revision as necessary to meet architectural needs

Perform structure design for temporary works

Coordinate with consulting team to resolve site issues

Supervise and monitor both the installation and the removal of excavation and lateral support (ELS) system

Review contractor’s submissions on shop drawings

Respond to inquiries from contractors; Provide suggestions and solutions

Manage project timeline; keep track of and communicate working progress to clients and management; Discuss any considerations; offer suggestion and solutions

Prepare report for OP inspection

Project: Proposed Commerical Building Development, J/O KWAI ON ROAD AND KWAI CHUNG ROAD

Hip Hing Construction Co., LTD, Hong Kong (Aug 17 – Jun 18)

Senior Structural Engineer

Coordinated with client and subcontractor on procedure regarding to top down construction

Resolved inquiries and comments from the building department of Hong Kong government relating to design and build items; made revision as necessary to meet architectural needs

Performed structure design for temporary works

Coordinated with consulting team to resolve site issues

Supervised and monitor both the installation and the removal of excavation and lateral support (ELS) system

Reviewed contractor’s submissions on shop drawings

Responded to inquiries from contractors; Provided suggestions and solutions

Managed project timeline; kept track of and communicated working progress to clients and management; Discussed any considerations; offered suggestion and solutions

Prepared report for OP inspection

Project: Proposed Residential Development at Site N of TKOTL 80 RP, LOHAS PARK

Hsin Chong Construction Group LTD, Hong Kong (Sept 13 – Jul 17)

Senior Structural Engineer

Resolved inquiries and comments from the building department of Hong Kong government relating to design and build items; made revision as necessary to meet architectural needs

Performed load analysis and frame analysis

Performed structure design for temporary works

Coordinated with consulting team to resolve site issues

Supervised and monitored both the installation and the removal of excavation and lateral support (ELS) system

Reviewed contractor’s submissions on shop drawings

Responded to inquiries from contractors; Provided suggestions and solutions

Managed project timeline; kept track of and communicated working progress to clients and management; Discussed any considerations; offered suggestion and solutions

Provided quality assurance through factory visit; examined materials quality (ex. Precast façade, temper glass etc.)

Prepared report for OP inspection

Project:

Kau Tau Shan, Residential Development (Gross Floor Area Approx.1000000 square feet) (Sept 13 – Jun 15)

307-309 Des Voeux Road West, Hong Kong Residential Redevelopment (Jun 15 – Nov 15)

Proposed Office Complex at Lam Lee Street, Kowloon Bay, NKIL 6312, Kowloon (Nov 15 – Jul 17)

Penta-Ocean Construction LTD, Hong Kong (Aug 12 – Sept 13)

Structural Engineer

Resolved inquiries and comments from the building department of Hong Kong government relating to design and build items; made revision as necessary to meet architectural needs

Performed load analysis and frame analysis

Performed structure design for temporary works

Coordinated with consulting team to resolve site issues

Supervised and monitored both the installation and the removal of ELS

Reviewed contractor’s submissions on shop drawings

Responded to inquiries from contractors; Provided suggestions and solutions

Managed project timeline; kept track of and communicated working progress to clients and management; Discussed any considerations; offered suggestion and solutions

Prepared necessary documents for OP inspection

Project: Kellett School (Aug 12 – Sept 13)

Meinhardt Consulting Engineer, Hong Kong (May 10 – Aug 12)

Engineer I

Performed new concrete design, steel beam design, new slab design, new steel structure design, member design, connection design, superstructure design, design of one story exhibition structure & foundation

Performed load analysis and frame analysis

Reviewed results generated by the engineering software to ensure reasonableness

Performed analysis for steel maintenance platform

Reviewed plans and works performed by China team to ensure completeness and accuracy

Reviewed works done by graduate engineer; provided training as necessary

Participated in the design consideration of roof drainage system

Compiled and verified to ensure accuracy on source information prior to design stage

Reviewed contractor’s submissions

Acted as Resident Engineer on site

Coordinated with architect & M&E to resolve design issues

Responded to queries from client/client representatives/contractors

Managed project timeline; kept track of and communicated working progress

Projects:

The Tamar Development Project (May 10 – Feb 11)

St. Francis’ Canossian College Redevelopment Project (Feb 11 – Apr 12)

Lee Theatre’s Alternation and Additional Works Project (Feb 11 – Apr 12)

Project Maintenance Platform at PTI for Housing Development at Yau Tong Estate-Phase Four Project (Feb 11 – Jun 11)

Tai Po Road Residential Development (Nine Stories) (Apr 12 – Aug 12)

HK Aviary (One Story) (Apr 12 – Aug 12)

338 Queens Road West (Fifty Stories Hotel) (Apr 12 – Aug 12)

23 Austin Road (Hotel Development) (Apr 12 – Aug 12)

Elements Engineering Corporation (Aug 09 – Jan 10)

Consultant/Partner

Prepared a detail plan design to create 800 sq ft. of living space from a residential garage

Conducted site visit and hold meetings with client to collect data necessary for the project

Organized and distributed tasks; keep track of working progress

Designed new wall, column footing and retaining wall using the 2001 California Building Code

Designed new beam, reinforcing existing beam and new stairs

Submitted drawings and calculations necessary to local government for construction permit issuance

Responded to client’s inquiries during planning and construction phase

 

Jeffrey Weber and Associates, Oakland, CA (Oct 06 – Nov 08)

Design Engineer

Performed client focused professional services, achieved client’s objective

Collected, documented and reviewed evidences; identified engineering solutions to support the design

Performed structural analysis of new and existing wood, concrete buildings

Performed lateral analysis using 2001 California Building Code and 2007 International Building Code

Designed Lateral Force Resisting System (wood and concrete shear wall, steel brace and steel moment frame)

Designed footing (spread footing, mate footing and grade beam), retaining wall and mini-pile

Performed plan detailing

Applied and referenced appropriate building code to the design

Chow Engineering, Oakland, CA (Aug 04 – Jul 06)

Associate Engineer

Supervised work progress at construction site

Conducted structural analysis of existing structures using RISA 3D

Performed wood and steel structures load calculation

Performed seismic calculation on tanks and machines

Prepared sketches and engineering plans using AutoCAD

San Francisco Public Utilities Commission, City Distribution Division (Aug 03 – Dec03)

Student Design Engineer Trainee I

Assisted professional engineers with design and retrofit of San Francisco Water Department pump stations and facilities

Assisted in preparing and checking engineering calculations

Conducted field inspections of existing structures

Prepared sketches and engineering plans using AutoCAD

Communicated with vendors and other departments relating to material specifications and estimates.